EEDI Required - the phase-reduced target
Look up the Required EEDI for a newbuild: ship-type reference line reduced by the phase factor per MEPC.328(76).
Reference line
4.357gCO₂ / t·nm
a × Capacity^(−c) per MEPC.328(76) Table 1
Required EEDI
3.050gCO₂ / t·nm
Reference × (1 − 30 %)
Formula, assumptions, and limits
Required EEDI = a × Capacity^(−c) × (1 − Z)
Z values: 0 % Phase 0 (2013–14), 10 % Phase 1 (2015–19), 20–30 % Phase 2 (2020–24), 5–50 % Phase 3 (contracted ≥ 1 April 2022) - exact value depends on ship type AND size band per MEPC.328(76) Table 1.