HomeCalculatorsSplash-Filling Rest Time (ISGOTT)

Splash-Filling Rest Time (ISGOTT)

Minimum rest time after initial loading before ullage measurements, per ISGOTT: allow 30 min for static-electricity decay before any non-bonded measuring tape is lowered.

TankerStatic
Required rest time
30min
Guidance
Wait 30 minutes after last flow before using portable UTI

Formula, assumptions, and limits

ISGOTT Ch.11 rest-time guidance. 30 min at ≤ 1 m/s loading velocity; scale up with faster initial velocities. If all gauging is closed-system (radar / servo level bonded to tank structure), no rest is needed. Filling velocity ≤ 1 m/s until liquid covers inlet.

Symbol legend

SymbolMeaningUnitSource
Initial filling velocitym/sprocedure
Rest time before non-bonded measurementminISGOTT