Dock Water Allowance (DWA)
Loadline draft correction for brackish water. When the ship's dock-water density lies between 1.000 and 1.025, the Summer load line may be submerged by the dock water allowance without violating ICLL.
Inputs
DWA
120mm
Formula, assumptions, and limits
Linear interpolation between FWA (ρ = 1000) and zero (ρ = 1025). Applies in the port until the ship enters full sea water - at which point the Summer load line must emerge.