NOR validity check
Check whether a Notice of Readiness is valid against the three principal conditions: arrival at the contractual point, physical readiness in all respects, and tendering through the prescribed channel within prescribed hours.
NOR status
Valid - laytime starts per CP grace
Action required
Record tender time on SoF
Logic
NOR is valid only if all four conditions are 'Yes'. An invalid NOR does not start laytime; the master must re-tender after rectifying the deficiency. See the NOR article.
Spotted an error in this calculation? . We acknowledge editorial corrections within two working days.