Tug Bollard Pull Required

Estimate tug bollard pull needed for a given displacement based on Henn & Dunlop empirical rule used in major ports.

MooringTug
Displacement-based BP
80t
Wind lateral force
771.8kN
Wind-only BP (1.5× margin)
118.0t

Formula, assumptions, and limits

$$BP \approx 60 \cdot \tfrac{\Delta}{60000} + 0.2, \quad BP_\text{wind} = 1.5 \cdot \tfrac{F_\text{wind}}{g}$$

Port-authority rules of thumb: typical large tanker needs 1× BP per 100,000 dwt; bulker 1× per 80,000 dwt; box-ship 1× per 60,000 dwt. Use the larger of the displacement-based BP and wind-force BP for the controlling design case.

Symbol legend

SymbolMeaningUnitSource
$Δ$Ship displacementtloading computer
$A$Exposed side area above waterGA plan
$V$Design wind speedm/sport rules
$BP$Bollard pull required per tugtresult