MARPOL Annex VI - EEDI Required
Required EEDI for new-build ship per MEPC.281(70) - the baseline the designer must meet vs reference line.
Reference line
4.36gCO₂/t·nm
Required EEDI
3.05gCO₂/t·nm
Formula, assumptions, and limits
Phase 3 30 % reduction from 2025 new builds. Container ships phased differently (15–50 % depending on size). Designer verifies via sea trial and correction factors.
Symbol legend
| Symbol | Meaning | Unit | Source |
|---|---|---|---|
| Segment reference coefficients | - | MEPC.281(70) Appendix | |
| Phase reduction factor | - | MEPC.281 Reg. 21 |