HomeCalculatorsPMS Completion Rate

PMS Completion Rate

Planned Maintenance System completion rate - the ratio of jobs completed on time vs jobs scheduled over the period. Class minimum typically 85 %.

MaintenancePMS
Completion rate
87.5%
Overdue %
5.0%
Status
Class minimum - watch overdue
Formula, assumptions, and limits

IACS UR Z11 and flag-state ISM audits commonly flag < 85 % completion. Critical-equipment overdue jobs (anything on the loadline / machinery / LSA critical list) trigger non-compliance regardless of overall rate.

Symbol legend

SymbolMeaningUnitSource
Jobs due in the period - PMS system
Jobs closed on time - PMS system
Jobs past due date - PMS system