HomeCalculatorsABS LNG Bunker Ready Notation

ABS LNG Bunker Ready Notation

Vessel-level readiness to receive LNG bunkers alongside - ship-to-ship or terminal transfer.

ClassABSLNG
Criteria met
4/4
Status
LNG Bunker Ready
Formula, assumptions, and limits

Pairs with SGMF operating procedures. Ship's BMS + PTW system must include LNG bunker-operation mode with shore-side interface.

Symbol legend

SymbolMeaningUnitSource
Emergency Shutdown system - IGF / SGMF
Line back to shore - IGF 7.3