Laytime Used
Laytime used = arrival to completion minus excepted periods. Compare against CP-allowed laytime to determine demurrage/despatch.
Laytime used
104.00h
Over/(under) laytime
32.00h
Status
On demurrage by 32.0 h
Formula, assumptions, and limits
Excepted periods: SHINC (Sundays & holidays INCluded) means laytime runs continuously; SHEX (EXcluded) means they pause. Weather periods, shifting, pilotage - all CP-specific. Happy-Day NOR validity rules apply to turn-time.
Symbol legend
| Symbol | Meaning | Unit | Source |
|---|---|---|---|
| Clock time from NOR to completion | h | SoF | |
| Excluded period per CP (typ 6 h) | h | CP | |
| SHEX, rain, weather suspension | h | SoF |